Bug 681
| Summary: | Labour Cost Can Be Added Without Entering Amount Per Hour | ||
|---|---|---|---|
| Product: | SIDAR | Reporter: | Mogan (Mogan) |
| Component: | Manufacturing | Assignee: | Rajiv (Rajiv) |
| Status: | OPEN --- | ||
| Severity: | High | ||
| Priority: | --- | ||
| Version: | unspecified | ||
| Hardware: | PC | ||
| OS: | Windows | ||
| Associated Test Case ID: | Triaged By: | --- | |
| Root Cause Analysis (RCA): | Resolution Summary / Fix Details: | ||
| Impact Area: | |||
| Attachments: | its a bug image | ||
Created attachment 512 [details] its a bug image While adding labour costs to a Manufacturing Estimation, the system allows the user to enter and save the labour cost amount without providing the Amount per Hour. This allows incomplete labour cost details to be saved without proper input validation.