Bug 359
| Summary: | Contract End Date can be saved as a date prior to the Start Date | ||
|---|---|---|---|
| Product: | Smartwas | Reporter: | Soundharaya (Soundharya) |
| Component: | Purchase | Assignee: | Arun (Arun) |
| Status: | OPEN --- | ||
| Severity: | Low | ||
| Priority: | --- | ||
| Version: | unspecified | ||
| Hardware: | PC | ||
| OS: | Windows | ||
| Associated Test Case ID: | Triaged By: | --- | |
| Root Cause Analysis (RCA): | Resolution Summary / Fix Details: | ||
| Impact Area: | |||
| Attachments: | Contract End Date can be saved as a date prior to the Start Date | ||
Created attachment 204 [details] Contract End Date can be saved as a date prior to the Start Date The system lacks chronological date validation, allowing a user to save a product contract where the Expiry/End Date occurs before the Start Date (e.g., Start: 2026-07-10, End: 2026-07-01). The system successfully saves and displays this impossible timeline in the data grid.